-
Prepare a sample risk register for a project to put humans on Mars (four or five risks).
Initial Postings: Read and reflect on the assigned readings for the week. Then post what you thought was the most important concept(s), method(s), term(s), and/or any other thing that you felt was worthy of your understanding in each assigned textbook chapter.
Your initial post should be based upon the assigned reading for the week, so the textbook should be a source listed in your reference section and cited within the body of the text. Other sources are not required but feel free to use them if they aid in your discussion.
Also, provide a graduate-level response to each of the following questions:
- Describe the general processes that should be followed in managing risks throughout a project. Be sure to include the general sequence in which these processes are carried out.
- Prepare a sample risk register for a project to put humans on Mars (four or five risks).
- What is the difference between qualitative and quantitative risk analysis? Which one is always done? Why is the other one not always done for every project?
[Your post must be substantive and demonstrate insight gained from the course material. Postings must be in the student’s own words – do not provide quotes!]
[Your initial post should be at least 150+ words and in APA format (including Times New Roman with font size 12 and double spaced).
Book:
Watt, A. (2019). Project Management, 2nd Edition. BCcampus Open Education. Retrieved from https://opentextbc.ca/projectmanagement/
We offer the best custom essay writing services at an affordable rate. We have done this assignment before, we can also do it for you.